March 9, 2016; The 7th floor club space in Corbett. (Photo by Barbara Johnston/University of Notre Dame)

3.9.16 Campus Crossroads 2394.JPG

1 of 1

March 9, 2016; The 7th floor club space in Corbett. (Photo by Barbara Johnston/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I0000RFVQMKDILCg

Keywords:

floor
7th
first
Corbett
Crossroads
construction
football
stadium