Sept. 3, 2015; Mary Hesburgh Flaherty signs a steel beam at the construction site of Flaherty Hall. (Photo by Barbara Johnston/University of Notre Dame)

9.4.15 Mary Hesburgh Flaherty 001.JPG

1 of 1

Sept. 3, 2015; Mary Hesburgh Flaherty signs a steel beam at the construction site of Flaherty Hall. (Photo by Barbara Johnston/University of Notre Dame)

Copyright University of Notre Dame

Copy link below when linking to original image:

https://photos.nd.edu/image/I0000Dv5HEx3bgFg

Keywords:

Mary
Hesburgh
Flaherty
steel
beam
Hall